Focus: Fire-Life Safety / Column

Regulations, Codes & Standards Q&A: EM lights in MRI

Brad Keyes discusses regulations for EM lights in MRI

By Brad Keyes / Special to Healthcare Facilities Today


Q: I have a question on the requirement for the battery backup lighting inside the MRI suites. We are in the process of building two new MRI centers and I am receiving a lot of push back from the Project Engineer.

This engineering group specializes in MRI projects and they tell me they never install battery backup lighting and that NFPA 99 does not require battery backup lighting anywhere outside of an operating room. I was told to reference 6.3.2.2.11.2 of NFPA 99-2012 which specifically mentions operating rooms. My reply was that 6.3.2.2.11.1 does not specify only operating rooms so it is much broader in scope and since we use anesthesia in the MRI it would be required.

Before I stir up the pot anymore with the engineering firm I wanted to make sure that if Anesthesia is being used in the MRI room that emergency battery backup lighting should be in place.

A: Yes… you are correct. NFPA 99-2012, section 6.3.2.2.11.1 requires one or more battery-powered lighting units within locations where deep sedation and general anesthesia is administered. That includes MRI areas, Cath Lab areas, and of course, Operating Rooms and Procedure rooms. ICUs and NICUs would typically not be included.

Just because the project engineer from the contractor has never been told to install battery powered lighting units before does not preclude the fact that it is a requirement and it is enforced by CMS and the Accreditation Organizations. The engineer is mistaken. 

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.



July 24, 2019


Topic Area: Regulations, Codes & Standards


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.