Focus: Fire-Life Safety / Column

Regulations, Codes & Standards Q&A: Fire/smoke damper drawings

Brad Keyes discusses regulations for fire/smoke damper drawings

By Brad Keyes / Special to Healthcare Facilities Today


Q: A California Life Safety Code surveyor enforcing the 2012 edition of the LSC asked for a map of all of the smoke and fire dampers in the building (skilled nursing home) and threatened a deficiency if one could not be produced. I have been searching the 2012 LSC and cannot find any such reference to this specific requirement. I have not heard of this before. Can you shed any light on this matter?

A: Yeah… I can understand the surveyor’s request, although threatening you with a citation seems a bit much.

The surveyor’s position is: How can you effectively maintain all of your fire/smoke dampers if you do not know where they are located? Having them documented on a drawing is logical in that you can then properly maintain the dampers. Without having them documented on a drawing, the chance is great that you would miss one or more dampers and they would not be tested.

But, to be sure, there is no standard that requires you to have drawings showing the locations of all fire/smoke dampers. But if you provide a test report that says you tested 25 dampers, how do you know where these 25 dampers are located, and you don’t have more than 25, and you got them all tested? I can see the surveyor could cite you with a finding that would read something like this: “The organization failed to provide evidence that all fire and smoke dampers were properly tested.” 

But I don’t approve of surveyors making threats… that is just unprofessional. 

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.



September 6, 2019


Topic Area: Regulations, Codes & Standards


Recent Posts

Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


Geisinger Finds Success with Violence Prevention Efforts

Their safety measures included training staff in de-escalation, active-shooter response drills and equipping 6,000 employees with duress notification badges.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.