Revisions to climate data standard from ASHRAE include new climate zone, climatic data

By Healthcare Facilities Today


ATLANTA — The newly updated Standard 169, Climatic Data for Building Design Standards, serves as a comprehensive source of climate data for those involved in building design, and provides a variety of climatic information for designing, planning and sizing building energy systems and equipment.

“Using the results from ASHRAE Research Project 1453 ‘Updating the ASHRAE Climatic Data for Design and Standards,’ the data and tables in the standard were completely replaced,” Dru Crawley, chair of the committee writing the standard, said.

An additional “Extremely Hot” Climate Zone 0 with humid (0A) and dry (0B) zones has been added, and the standard now includes climatic data for 5,564 locations throughout the world.

“With this major revision, Standard 169 now includes climate zone maps for the entire world, as opposed to the 2006 standard which only included a U.S. climate zone map,” Crawley said. “This allows users outside the U.S. to more easily determine which climate zone their location is in.”

The standard touches on dry-bulb, dew-point and wet-bulb temperatures; enthalpy; humidity ration; wind conditions; solar irradiation; latitude; longitude; and elevation for locations worldwide.

Standard 169 also includes statistical data, such as mean temperatures; daily ranges; degree hours; and seasonal percentages within ranges of temperatures, to name just a few.

The cost of ANSI/ASHRAE Standard 169, Climatic Data for Building Design Standards, is $72 ($61, ASHRAE members). To order, contact ASHRAE Customer Contact Center at 1-800-527-4723 (United States and Canada) or 404-636-8400 (worldwide), fax 678-539-2129, or visit www.ashrae.org/bookstore.

ASHRAE, founded in 1894, is a building technology society with more than 50,000 members worldwide. The Society and its members focus on building systems, energy efficiency, indoor air quality, refrigeration and sustainability. Through research, standards writing, publishing, certification and continuing education, ASHRAE shapes tomorrow’s built environment today.



January 10, 2014


Topic Area: Press Release


Recent Posts

Novant Health Gets Approval for Wesley Chapel Medical Center

The 32-bed hospital will be located in Monroe and is expected to be completed in 2030.


Rocky Mountain Associated Physicians Falls Victim to Data Breach

On February 2, 2026, Rocky Mountain confirmed that certain patient information may have been compromised because of a data security incident. 


The Disconnect Between EVS and Clinical Teams

A recent study shows that EVS feels disconnected from the clinical community, leading to negative experiences. 


Nemours Children's Hospital Opens Institute for Maternal Fetal Health in Delaware

The Institute for Maternal Fetal Health represents a comprehensive approach to supporting expectant patients who receive a complex diagnosis during pregnancy.


Memorial Jerome Medical Center Officially Opens

The new Jerome Medical Center features a state-of-the-art facility, home to many high demand services for area residents.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.