Rush Memorial Expands Treatment Capacity with Renovation


Healthcare environments need the ability to flex their patient care spaces to meet fluctuating demand. With physical environments, this is not easy to achieve. Design Collaborative recently worked closely with Rush Memorial Hospital to modernize its Med-Surg space to better serve its patient community and medical staff. Through strategic programming and planning, the design team was able to fit eight (8) private rooms and one (1) step-down ICU beds in the renovated space. The former multi-patient rooms were converted to private rooms with the capability of accommodating a second patient when circumstances require.  Future planned renovations will introduce upwards of six (6) more beds to the unit.

All but two of the private rooms are fitted with a primary and secondary headwall. The secondary headwall has all the same functions as the primary headwall. However, when not in use, the secondary headwall serves as storage with the primary services designed to be hidden. This allows for private rooms to function as semi-private rooms when the census or other circumstances dictate. The added flexibility of the patient rooms allows the hospital system to have a total capacity of 15 functioning beds on the Med-Surg unit when demand or needs require it.

The changes to the Med-Surg floor also included the relocation and expanded renovation of the nurse station and supporting functions to not only increase collaboration among staff but also provide better wayfinding and access to patients. All work was completed in phases to allow for the continual operation of the Med-Surg floor and service to the community. The outcome of the renovation hopes to have a direct, positive impact on Rush Memorial’s HCAHPS scores. The project completed in March 2020 and included approximately 5,800-square-feet of space. To learn more about Design Collaborative, please visit the website.



July 6, 2020


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.