SP Industries Introduces CP-1501: High Density, Single Cylinder Stationary Commercial Compactor Serviceable by Front/Rear Load Trucks


SP Industries offers the CP-1501 commercial compactor. With a single cylinder design, this compactor easily handles dry waste and packaging materials. By packing into a front or rear load container, this machine is serviceable by the haulers standard front/rear load route, which eliminates downtime and the need for a second container. The CP-1501 helps lower costs by creating high density, reduced volume material, which requires less space and fewer trips to the landfill or recycling center. Compaction also keeps materials safely undercover and out of sight, preventing waste from becoming windblown debris or a source of pollution. The CP-1501 is ideal for business offices, retail outlets, hotels and universities.

CP-1501 highlights include:

  • Serviceable by Front/Rear Load Trucks

  • Large, clear top opening of 45.6” x 46”

  • Capacity: 1-1/2 cubic yards

  • Volume displacement: 90 cubic yards/hour

  • Cycle time: 50 seconds

  • 39,500 lbs. maximum force

  • Numerous specialty optional equipment and design features

All SP compactors meet/exceed ANSI and OSHA specifications for safety, and are backed by the company’s best-in-industry warranty program. American supplied electrical and hydraulic components are specified for reliability and easy nationwide serviceability.

For more information, visit: bestcompactors.com, email: info@sp-industries.com, or call: 269.793.3232.



May 4, 2017


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.