SPX Cooling Technologies Announces Redesigned Marley AV Cooling Tower


 SPX Cooling Technologies, Inc. a full-line, full-service industry leader in the design and manufacture of cooling towers and other specialized heat exchangers, announces a redesign of its popular Marley AV line of factory-assembled single flow cooling towers. The new induced draft crossflow design features both single and multi-fan models and a broader tonnage range from 122 to 772 nominal tons and flowrate of 117 to 1541 gpm (27 to 350 m3/hr).The AV provides a compact footprint and is well-suited to support air conditioning and refrigeration systems as well as light industrial loads.

A bearing housing belt drive system is standard equipment; the Marley Geareducer® and motor outside airstream (MOA) options are available on some models. Other popular selections include welded stainless steel basins, sweeper piping, interior mechanical and access door platforms, slip-resistant plenum walkway and hot water basin guardrail system for safe and easy inspection and maintenance.

Featuring the new, patent-pending MarKey™ Drift Eliminators, the AV Cooling Tower achieves the lowest measureable drift rate, down to 0.0005 percent of circulating water flow, so less water escapes the tower. Quiet and ultra-quiet fan options are factory installed on most models. Control packages offer single point power connections for a range of systems. The AV is certified by the Cooling Technology Institute (CTI) and multi-cell models are Factory Mutual approved. The line is available worldwide.

For more information about SPX Cooling Technologies, visit www.spxcooling.com.

 



March 16, 2017


Topic Area: Press Release


Recent Posts

3 Ways to Secure a Healthcare Facility

As workplace violence grows in healthcare, being aware of different security methods can help prevent and address dangerous situations.


Use Cases for Insulated Metal Panels in Healthcare Building Projects

Case study: The UC Medical Center selected IMPs for its ongoing revitalization project.


Memorial Healthcare System Plans Two New Freestanding Emergency Departments

Construction is expected to begin in early 2025 and complete by mid 2026.


Communication Proves to Be Essential Task During Design Phase

Projects go over more smoothly when people are transparent and communicating openly.


Northwest Healthcare Acquires Carbon Health Urgent Care Centers in Arizona

With this acquisition, Northwest Healthcare has more than 80 sites of care.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.