Schneider Electric Unveils Hospital Optimizer


Energy management and automation specialist Schneider Electric has unveiled its Clinical Environment Optimization system, aimed at hospital environments. 

The optimiser is delivered as an application for the company's StruxureWare Building Operation software and integrates hospitals' clinical infrastructure with corresponding facility elements. 

The Clinical Environment Optimization tool creates interoperability between a hospital’s building management system (BMS) and its clinical scheduling, housekeeping and admission, discharge and transfer systems.

It shares the occupancy status of patient rooms and operating theaters with the hospital’s BMS through the Health Level-7 (HL7) interface.

 

The BMS then sets rooms to predetermined set points for HVAC and lighting during vacancy to achieve energy savings during unoccupied times.

The BMS puts the room back into normal operation when it receives a notification that the patient will be returning or when a room has been assigned to maintain the optimal environment for patient healing and satisfaction.

Key benefits of the Clinical Environment Optimization platform include energy savings, improved staff productivity, and enhanced patient satisfaction. 

Facilities managers can reduce energy use in rooms that are vacant or unoccupied for long periods of time, and patients have the ability to specify their preferred room temperature during the admission process or control it from their room via a mobile app.



February 10, 2017


Topic Area: Press Release


Recent Posts

EV Charging Stations: Planning for Safety, Convenience, Expansion

Managers need to ensure patient access, coordinate with clinical operations and ensure every phase of construction supports the facility's mission.


Why Ambulatory Surgery Centers Are Turning to Dedicated HVAC Systems

Design experts from Neenan Archistruction explain how single-unit HVAC systems for each operating room enhance infection control, comfort, and resiliency.


Ground Broken on UW Health University Row Medical Center

Construction is expected to be completed by the end of 2027.


Better, More Thorough Cleaning Saves Lives

Cleanliness is the first line of defense to protect patients from killer pathogens, but many hospitals refuse to make it a priority.


Encompass Health Opens the Rehabilitation Hospital of Amarillo

The 50-bed inpatient rehabilitation hospital is now accepting patients.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.