Silent Knight launches educational Life Safety Code seminars

By Healthcare Facilities Today


NORTHFORD, Conn.- Silent Knight by Honeywell (NYSE: HON)  announces the launch of a nationwide series of seminars featuring industry experts speaking on current life safety systems requirements specific to each session’s region. Seminar content is geared toward the needs of architects, engineers, code enforcement officials, and facility managers responsible for life safety systems, occupant health and security. The free, half-day seminars will run February through April, and qualify attendees to receive continuing education units (CEUs) and Continuing Professional Development Credits (CPDs). 

Each seminar’s guest speaker will be an engineer, Authority Having Jurisdiction (AHJ) or qualified life safety consultant, providing updates on the region’s latest code adoptions from the National Fire Protection Association (NFPA), International Building Code (IBC) and International Fire Code (IFC). The area’s employment of more fire alarm voice evacuation systems and the rising demand for emergency communication systems will also be addressed, with added emphasis on meeting audio intelligibility mandates. Presenters will also walk through real examples of recent fire alarm and voice evacuation system designs from the region, noting key pitfalls to avoid. In addition to valuable handouts, each seminar will offer attendees ample time for questions and answers.

The seminars’ educational presentation runs 8 a.m. to 12 p.m., with breakfast and lunch provided free-of-charge. To view the full schedule of Silent Knight’s Farenhyt Life Safety Code Seminars and register to attend one online, visit www.farenhyt.com. Space is limited and seminar seats are filled on a first-come, first-served basis.

 

 



January 30, 2014


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.