The COVID-19 pandemic reinforced the importance of paying attention to details to ensure power and cooling reliability. By focusing on the basics, facility managers who are responsible for hospitals and other critical facilities can reduce unplanned downtime. 

A good starting point is to understand ways to prevent common problems. These tips can help facility managers avoid costly issues, especially if limited staff is working onsite.

Panel board, switchboard and switchgear structures, bus work, metering, and controls are fairly stable. Little goes wrong with fused switches. Circuit breakers, on the other hand, are a major source of unplanned power interruption. They are designed to trip with seemingly hair-trigger sensitivity. And once open, if something is not exactly right with the breaker, it will not allow reclosing. 

Why is this? 

Circuit breakers are life-safety devices. When in doubt, manufacturers want them to fail safe and trip open and remain open. The alternative could result in overload, arc-flash, explosion, or fire with significant liability. Here are some tips to reduce critical breaker downtime risk:

1. Make sure breakers with adjustable trip settings are adjusted properly, or at least dialed up from minimum (most trip-happy) setpoints. Most breakers ship from the factory with adjustments at minimums (to reduce risk and liability). Many electrical contractors will install or replace adjustable breakers but won’t touch adjustments unless setpoints are provided to them.

2. All facilities, regardless of criticality, should maintain an up-to-date over-current protective device coordination study and associated trip adjustments and arc-flash hazard labeling. For most critical facilities, selective coordination is less important than making sure breakers are not set too sensitively. The software used by engineers to perform the study errs toward breaker tripping. Any adjustment on any critical breaker that is set at or very near the minimum should raise a red flag — it is an unplanned shutdown waiting to happen. 

3. Circuit breakers are not as forgiving of overloads as other equipment. Overloaded breakers won’t slow the motors or dim the lights; they will stop the motors and turn off the lights. Most breakers should never be continuously loaded beyond 80 percent of frame rating or beyond 90 percent of trip rating.

4. Test new breakers before applying in critical situations. Large breakers should be primary-current injection tested. Small molded case breakers should be bench-tested as a minimum against short circuits and open circuits, and in case one or more poles don’t open or close with the other poles.

5. Old breakers (and switches) that have not been exercised in years (opened and closed) should be exercised during maintenance (higher risk) windows.

6. No matter how careful you are with circuit breakers (unlike fuses) they can still nuisance-trip when new and fully tested even at very light loads. Good critical power design never allows a breaker or switch to become a potential single point failure risk.

Michael Fluegeman (mfluegeman@plannet.com), PE, is director of engineering and principal, critical facilities, for PlanNet, an independent professional services firm that provides advisory, design, project management, and construction services supporting critical IT infrastructure.

Antonio “Tommy” Tan III (ttan@plannet.com), P.E., is a critical facilities mechanical engineer at PlanNet.



March 26, 2021


Topic Area: Energy and Power


Recent Posts

AI Adoption on the Rise Among Leaders

AI usage increased in all markets in the fourth quarter of 2025.


TriasMD Officially Opens DISC Surgery Center at Tarzana

At 10,930 square feet, DISC Surgery Center at Tarzana includes three high-technology operating rooms and 11 patient care bays.


Goshen Health Announces Partnership with Parkview Health

Through this partnership, Goshen anticipates becoming Parkview's largest hospital outside of Fort Wayne and will serve as a regional hub for care, access and growth.


Severe Winter Weather: What Healthcare Facilities Must Prioritize

Prioritizing critical systems and strategies is key to protecting patients, staff and operations during severe winter weather.


Recovery Centers of America Opens New Facility in Florida

Spanning 19 acres, the campus will include seven buildings, a pond, an outdoor recreation area with a pool, a full basketball court and a rock-climbing wall.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.