Spirax Sarco releases STS17.2 steam trapping station


Spirax Sarco, the leader in products and services for steam system solutions is pleased to announce the release of the STS17.2 Steam Trapping Station.  The STS17.2 is a complete assembly comprised of an isolation valve, a steam trap connector with strainer and a check valve in a sleek, modular body.  The convenient ‘ready-to-install’, single-piece body virtually eliminates potential leak paths caused by multiple screwed connections that conventional steam trapping stations and on-site fabricated installations typically include. 

The STS17.2 steam trapping station technology allows a steam trap to be changed in minutes rather than hours, reducing plant downtime and ensuring hassle-free maintenance.

Features and benefits include:

• Quick and simple maintenance of the steam trap with simple two-bolt connector, reducing system downtime and maintenance costs

• Innovative leak free body design that reduces carbon footprint

• Ability to integrate steam trap monitor allows for quick recognition of trap failure

• Pre-assembled construction makes installation quick and easy

• High performance stainless steel components for long, trouble-free service

About Spirax Sarco, Inc. 

For engineers around the world Spirax Sarco is synonymous with excellence in steam system management. We offer the industry’s most extensive range of products and services, coupled with expertise based on over a century of practical application across a variety of industries. In short we create the solutions that set the benchmark for steam-using organizations worldwide, working alongside them to improve productivity, save energy and reduce waste.

 



September 24, 2015


Topic Area: Press Release


Recent Posts

Technology Trends for Healthcare Real Estate in 2025

AI and other sophisticated technologies are looking to influence healthcare real estate in the new year.


Advocate Healthcare Invests $1 Billion Into Chicago's South Side

The expansive investment in a wellness model is the direct result of an extensive community input process over much of 2024.


Children's Medical Center Plano Opens New Patient Tower

The expansion will triple the campus’ bed capacity.


Layered Security on the Rise in Facilities

More than three-quarters of survey respondents say digital and physical security integration is critical.


OhioHealth Plans New Comprehensive Outpatient Cancer Center

Construction is slated to begin in the spring of 2026, with the goal to open for patient care in the spring of 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.