Texas hospital elevator had safety problems before employee was hurt

The elevator had been out of service at least four times in the year before the accident


The elevator in which an employee at John Peter Smith Hospital in Fort Worth,, Texas, was seriously hurt has had a history of maintenance and safety problems dating back to at least 2015, according to an article on the Star-Telegram website.

The elevator had been out of service at least four times in the year before the accident, including for at least two weeks in the month prior to Jan. 20, the date of the accident. The elevator has not been put back into service.

In 2015, the elevator was flagged for having undersized hoist ropes and for problems with the pressure setting on its door-closure system, according to records.

Records also show that the hospital’s elevators were out of service at least 42 times from January 2018 to January 2019s. At least one other person has been hurt — suffering a serious head injury on May 20, 2018 — in an elevator accident.

Read  the article.  

 



February 25, 2019


Topic Area: Maintenance and Operations


Recent Posts

Healthcare Facilities are Shifting Toward More Holistic Designs

As healthcare moves toward prevention and long-term wellness, the Alice L. Walton Healthcare Campus illustrates how design strategies are evolving to support this transition. 


Froedtert Hospital Unveils Six-Level Parking Structure

The new garage, which boasts a glass-enclosed design and modern parking management technology, elevates the parking experience.


Nemours Children's Breaks Ground on New Multi-Specialty Care Facility in Melbourne

With construction set to officially begin this summer, Nemours Children’s Health, Viera is expected to open in the summer of 2027.


Designing for Caregiver-Centered Support Spaces

When healthcare environments are designed to meet the needs of caregivers and patients, everyone who relies on the system experiences better outcomes.


Novant Health Gets Approval for Wesley Chapel Medical Center

The 32-bed hospital will be located in Monroe and is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.