Three-Sided Angle Installation for Greenheck Fire and Combination Fire Smoke Dampers


 

 

 

Greenheck has developed a UL-approved three-sided retaining angle installation method for fire and combination fire smoke dampers. This method is ideal for installations where the damper sleeve is tight up against a wall, floor, or other obstruction with no room for a retaining angle on one side. Greenheck’s installation does not require the use of any firestop material, while other three-sided angle installation methods require fire stop material to be applied to a specified minimum thickness on the side of the damper without the retaining angle. Complying with the minimum thickness requirement without scraping off the fire stop material during installation can be difficult, and makes it complicated for building inspectors to confirm that the required amount of fire stop material has been applied.

With Greenheck’s three-sided angle installation method, fasteners are run from inside the damper into the wall opening on the side without the retaining angle. This makes for a faster, cleaner and more cost effective installation.

Greenheck, the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment, offers the most UL certified dampers and the largest selection of AMCA licensed dampers in the industry. For more information about Greenheck products, visit www.greenheck.com.

 
 


January 11, 2019


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.