Training and Certification Requirements for Maintaining Fire Alarm Systems

Testing must be done on an annual basis.


Only qualified and experienced service personnel are permitted to perform inspection, testing and maintenance. These technicians must meet one or more of the following criteria per NFPA 72, 10.5.3.4, according to an article from Facility Maintenance Decisions on the FacilitiesNet website.

Technicians must be:

• Factory trained and certified for the specific type and brand of system being serviced

• Certified by a nationally recognized certifications organization acceptable to the AHJ

• Registered, licensed or certified by a state or local authority — either individually or through affiliation with an organization — to service systems addressed within the scope of this code

• Employed and qualified by an organization listed by a nationally recognized testing laboratory for servicing systems within the scope of this code

It might be difficult for managers to determine the level of training or certification required, since the code does not specify these levels. The local AHJ might have specific qualification requirements for servicing companies. The code allows inspection, testing or maintenance to be done by a building or system owner or a person or organization other than the building or system owner. 

But it is the building owner's responsibility to ensure that only properly trained and competent persons perform inspection, testing and maintenance. Managers need to keep records on resumes, training and qualifications.

Read the full FacilitiesNet article.



August 25, 2020


Topic Area: Regulations, Codes & Standards


Recent Posts

The OR HVAC Puzzle: Why Individual Systems Are on the Rise

Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.


Sutter Health Announces Plans for New Santa Clara Medical Center

Sutter projects the medical center will open in late 2031.


Sanford Health Receives $300M Gift for Black Hills Medical Center Campus

Construction is scheduled to begin in 2027 with completion expected by 2030.


Wanted: Scientific Standard for Hospital Cleaning

No accepted criteria exist for defining a surface as clean using microbiologic methods.


NLCS Strengthens Safety and Compliance with Comprehensive Electrical Program

Case study: A renewed partnership with Siemens helps the senior living provider meet NFPA 70B standards, reduce risk, and enhance reliability across its communities.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.