Tubelite meets ICC-ES acceptance criteria for quality documentation (AC10)


Tubelite Inc.’s facilities Walker and Reed City, Michigan, successfully meet ICC Evaluation Services, LLC (ICC-ES) Acceptance Criteria for Quality Documentation (AC10). This third-party inspection by Architectural Testing, Inc. (ATI)/Intertek verifies Tubelite’s quality control process for its products, systems and materials.

“At Tubelite, ‘dependable’ is more than part of our brand identity, it’s part of our everyday culture, our products and our services. Our reputation for dependability is closely connected with our ongoing investment in quality, our continuing improvement initiatives, and our product development and certification efforts,” said Mary Olivier, Tubelite’s director of marketing.

Grace Bartrand, Tubelite’s quality assurance specialist, added, “Being a manufacturer with an AC10-compliant quality system also contributes to achieving Florida Product Approval for our hurricane-resistant, impact-rated storefront, curtainwall, window and entrance systems.”

ICC-ES requires a qualifying inspection of the facilities’ manufacturing products prior to issuing a new evaluation report. According to ICC-ES, “The qualifying inspection is intended to verify that the manufactured products are consistent with the products described in the evaluation report, and that the manufacturer has documented and effectively implemented a quality control system that meets all requirements of the ICC-ES Acceptance Criteria for Quality Documentation (AC10).”

 



June 2, 2015


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.