TonelsonProductions / Shutterstock.com

VA To Build New Hospital in Louisville

910,115-square-foot medical center will replace existing Robley Rex VA Medical Center

By Dan Hounsell, Senior Editor


The U.S. Department of Veterans Affairs (VA) and the U.S. Army Corps of Engineers (USACE) recently announced a new 104-bed, full-service hospital in Louisville, Kentucky, that will replace the existing Robley Rex VA Medical Center.

An $840 million contract for the project includes constructing a new 910,115-square-foot medical center, parking structures, a 42,205-square-foot central utility plant, and roadways, sidewalks, and other site improvements. Groundbreaking for the new Louisville VA Medical Center, located on approximately 34 acres of land, is expected to occur in the fall of 2021. Construction is anticipated to be complete in 2025.

The new hospital will integrate modern patient-centered care concepts to provide the best possible care for Veterans. To specifically address the needs of our women Veterans, the new hospital also will include a Women’s Health Clinic with 4 Patient Aligned Care Teams. USACE will support the VA with design, planning, and construction of facilities.

“The announcement of today’s contract award is a testament to the strong partnership between the U.S. Army Corps of Engineers and the Department of Veterans Affairs and brings us one step closer to delivering this much-anticipated state-of-the-art medical facility,” said Col. Eric Crispino, USACE’s Louisville district commander. “We are proud to play a role in this project and remain committed to delivering the new Louisville VA Medical Center in a timely and cost-effective manner to serve our local Kentuckiana Veterans.”



October 20, 2021


Topic Area: Construction


Recent Posts

Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


Geisinger Finds Success with Violence Prevention Efforts

Their safety measures included training staff in de-escalation, active-shooter response drills and equipping 6,000 employees with duress notification badges.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.