Vacon launches new compact NXC Drive


Vacon introduces the NXC Drive – an enclosed, variable-speed AC drive for high-power applications that is also one of the most compact of its type on the market. Designed to meet demanding requirements for flexibility and robustness, the NXC is available in NEMA 1 and NEMA 12 variations. Ideal for use in the mining, oil and gas, water and wastewater industries, typical applications for the NXC include: pumps and fans, extruders, main propulsion and bow thrusters, conveyers and crushers, feeders and mixes, winches, compressors, test benches, static power supply and industrial elevators. The NXC is available with a standard diode front end, or with an active front end when there are requirements for low harmonic and/or the capability of regenerating 100% of its power back to the incoming line.

The Vacon NXC is exceptionally user friendly. The control compartment is easily accessible for relays, auxiliary terminals and other equipment, with ample space for connecting power cables. It includes Vacon’s handy keypad on the door with additional options for indicators, meters and switches. Enclosures are simple to install with lifting lugs (include. Bottom plates and earthing clamps for 360-degree earthing of motor cables are provided as standard.

Reliable thermal handling for the enclosure guarantees extended lifetime of the frequency converter and ensures that challenging environments don’t impact application processes or disturb other electrical equipment. Approved EMC solutions ensure reliable operation of the converter without disturbing other electrical equipment. Other technical features include: 

• Power range of 110 kW to 2 MW

• Voltage ranges of 380-500 V, 525-690 V 

• Rittal TS8 frame 

• EMC approved (EN61800-3, 2nd env.)

 



May 28, 2015


Topic Area: Press Release


Recent Posts

Technology Trends for Healthcare Real Estate in 2025

AI and other sophisticated technologies are looking to influence healthcare real estate in the new year.


Advocate Healthcare Invests $1 Billion Into Chicago's South Side

The expansive investment in a wellness model is the direct result of an extensive community input process over much of 2024.


Children's Medical Center Plano Opens New Patient Tower

The expansion will triple the campus’ bed capacity.


Layered Security on the Rise in Facilities

More than three-quarters of survey respondents say digital and physical security integration is critical.


OhioHealth Plans New Comprehensive Outpatient Cancer Center

Construction is slated to begin in the spring of 2026, with the goal to open for patient care in the spring of 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.