VideoEdge TrickleStor Technology Maintains Video Surveillance System Integrity


Johnson Controls has introduced VideoEdge®  TrickleStor, designed to maintain the integrity of video data in a surveillance system in the event of network connectivity loss. 

TrickleStor provides a highly-integrated camera and network video recorder (NVR) connectivity solution between VideoEdge NVRs and Illustra® IP cameras that records video locally on Illustra cameras in the event of a connection failure, protecting against video loss in the case of NVR updates or network outage. 

When connectivity to the VideoEdge NVR is lost, video is recorded directly onto the camera’s SD card at the same frame rate, resolution and encoding. When connectivity is reestablished, the protected recorded video is automatically inserted into the media database at the correct date and time.  The missing video is pulled from the camera to the NVR at an ultra-low bitrate to minimize bandwidth consumption caused by the video retrieval. There is no discernible difference between the trickled-back video and previously recorded video when the stream is reviewed. 

TrickleStor maximizes SD card lifespan and resources by only recording video to the SD card when connectivity to the NVR is lost, creating a seamless stream of video in the database without any user intervention. This automates the process of media database repair and reduces the number of areas that a customer needs to be concerned about when a network communication failure event occurs. 

For more information on TrickleStor, please visit www.americandynamics.net/Products/videoedge-tricklestor.aspx. 
 

 



April 12, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.