Water Jet Targets Heavy-Duty Clogs


Great for a wide range of heavy-duty plumbing, drain cleaning, maintenance, and rental applications, the Typhoon trailer jet from General Pipe Cleaners blows away blockages in big lines and long runs. 

The Typhoon delivers 12 gallons a minute at 2500 psi to blast grease, sediment and debris from 4” to 12” lines up to 400 ft. long. And a 200 gallon holding tank carries enough water to handle remote locations where access to water is limited. 

General’s brawny machine also boasts electric brakes, safety strobe light, safety cones, rear fold-down stabilizer jacks, retractable hose guide arm, and antifreeze system as standard equipment. 

Its reliable 690 cc (24 hp) Honda engine with electric start and 7 gallon fuel tank ensures extended performance on stubborn stoppages. On-demand Vibra-pulse® helps slide the nozzle around tight bends – and propel the hose down long lines. 

Two hose reels – a jet hose reel with 400 ft. x 1/2" capacity featuring variable speed electric rewind, and a water supply hose reel carrying 150 ft. x 3/4" hose – are mounted at the rear of the unit next to the pressure gauge and output valve. Engine controls, including an hour meter, are located within easy reach in the lockable tool box with slide action doors just below the reels. 

General’s Typhoon trailer jet rides on rugged 15" radial tires with modular wheels and a leaf-spring suspension rated at 3500 lbs per axle. A splash guard at the front helps protect the pump and engine from road debris. And the body is protected by a tough epoxy finish for added weather protection. The Typhoon is also available in a skid mount model.



May 24, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.