Wayne Dalton Expands Commercial High Speed Door Product Line


 

Wayne Dalton, a leading manufacturer of residential and commercial garage doors in the United States, has expanded its commercial product offerings to include two new high speed doors — Models 888 ADV-X and 889 ADV-X. Ideal for applications that see heavy use, such as auto dealerships, medical facilities, parking garages, and manufacturing facilities, Models 888 ADV-X and 889 ADV-X operate at up to 80" per second for maximum efficiency and feature a helical design that requires minimal interruption for maintenance.

Model 888 ADV-X is made of a dual-walled, solid aluminum curtain for security and privacy. For applications where visibility is desired, Model 889 ADV-X features corrosion-resistant aluminum and impact-resistant polycarbonate panels that allow light infiltration. Models 888 ADV-X and 889 ADV-X come with a fully-assembled curtain that arrives pre-wrapped in headplate and trusses, ready for installation, in addition to a completely hinged guide and pre-wired connection for plug and play accessories. The helical design prevents the curtain from wrapping upon itself and rubbing, saving time and money on costly repairs.

“Our goal with the launch of Model 888 ADV-X and 889 ADV-X was to produce two high-end, visually appealing doors that meet the needs of warehouses and facilities seeking a high cycle, high speed door that is made durably with top-notch performance features that can be easily set up and maintained, for years of worry-free operation,” Mark Sawicki, Senior Product Manager for High Speed Doors at Wayne Dalton.

Both Wayne Dalton doors were independently-tested to determine how much pressure per square foot (psf) they could withstand. Model 888 ADV-X proved capable of withstanding up to +100/-100 psf ultimate pressure and operating under pressures of up to +5/-5 psf. Model 889 ADV-X proved capable of withstanding up to +50/-50 psf ultimate pressure and operating under pressures of up to +5/-5 psf.

 For more information, visit www.Wayne-Dalton.com

 



February 4, 2019


Topic Area: Press Release


Recent Posts

Code Compliance Isn't Enough for Healthcare Resilience

Intensifying climate risks are pushing hospitals to think beyond code requirements and toward long-term resilience.


Ribbon Cutting Marks First Phase Completion for New Montefiore Einstein Facility

The second phase is expected to be completed in the second half of 2027.


Brooks Rehabilitation Launches 3 New Major Construction Projects

All three Jacksonville projects will begin construction in 2026 with plans to be completed in 2027 and early 2028.


Joint Commission Standards: What Updates Matter Most?

The latest revisions are streamlined and aligned with the Centers for Medicare and Medicaid Services, but the facility manager’s learning curve is steep.


Swinerton Completes Construction at Atlanta's Grady Hospital

Projects mark Swinerton’s first partnership with Georgia’s largest hospital.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.