Zurn integrates flood control components for simplified specification and installation

By Healthcare Facilities Today


ERIE, PA – Zurn Industries, LLC introduces the Zurn Wilkins Flood Control Integrated System (FCIS), a bundling of three separate components that detect and shut down discharging backflow preventers installed in mechanical rooms or other indoor spaces.

The new Zurn Wilkins FCIS is easy to specify and install, and it protects building owners from flood risk/liability. Flood from a code-mandated reduced pressure (RP) device installed indoors, even when working properly, can result in millions of dollars in cleanup and downtime. The Zurn FCIS can shut off water supply to the backflow–and can be configured to signal the alarm panel and/or divert water to another device.

“As one bundled product, the new Zurn Wilkins FCIS is much simpler for specifiers and installers,” says Ezra Philips, Product Manager of Zurn. “And the system’s quick-connection modularity eliminates the need for an electrical contractor, saving labor time and money.”

The Zurn Wilkins FCIS is comprised of the following:

* Reduced Pressure Principle Assembly with Integral Relief Valve Monitor (Models 375AMS/475MS/975XLMS) that employs Zurn’s patented monitor switch that senses a discharge.

* Electronic Solenoid Timer (Model EST) processes signal from flood sensing equipment against a settable time function (to eliminate nuisance trips), and in the case of a fault sends a signa to a solenoid valve and/or alarm device.

* Solenoid Actuated Automatic Control Valve (ZW206) shuts off water through the system.

The Zurn Wilkins FCIS can be shipped fully assembled (with the EST directly mounted on the ACV) for turnkey installation in retrofit and other projects. Additional cables to wire parallel bypass systems and/or backpressure shutoff valves are available as accessories.

Two Worst-Case Scenarios

An eight-inch backflow preventer at 100psi can discharge 600 gpm, quickly overwhelming a mechanical room’s floor drainage system. One incident made headlines in 1994 when a Syracuse, NY hospital’s mechanical room was inundated by 100,000 gallons of water from a backflow discharge.  The water filled the room to a height of eight feet and caused extensive equipment failures. Patients were evacuated and one died in transport. The domestic water supply was contaminated as a result.  Cleanup and patient transfer costs were put at more than $2,000,000.

A separate incident, cited by the American Backflow Prevention Association (ABPA), occurred at a Fort Collins, CO hospital in 2001. An eight-inch double check backflow preventer blew, causing thousands of gallons of water to dump into the basement maintenance building, “knocking out the hospital’s telephone lines and computer systems, and causing evacuations.” In the equipment room where the break occurred, workers found four feet of standing water. Other rooms were also flooded.

About Zurn Industries

Zurn Industries, LLC is a recognized leader in commercial, municipal, healthcare and industrial markets.  Zurn manufactures the largest breadth of engineered water solutions in the industry, including a wide spectrum of sustainable plumbing products. Zurn delivers total building solutions for new construction and retrofit applications that enhance any building’s environment.  For more information, visit www.zurn.com.

 



December 6, 2013


Topic Area: Press Release


Recent Posts

Designing Hospitals for Wellness

Thoughtfully designed spaces can transform the overall well-being of patients, staff and caregivers.


Baptist Health Announces New Cancer Care Center in Key West

The building will be two stories tall and span 4,300 square feet.


Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.