Skender’s Healthcare Portfolio Growing as Firm Completes Several Projects for Major Chicago Health System


Skender’s healthcare team has won construction management assignments for several projects throughout Chicago. Among the projects recently started or nearing completion:

• NM Immediate Care Clinic (West Loop, Chicago) – 5,500-SF build-out in new core and shell building at 171 N. Aberdeen featuring six exam rooms, an x-ray room, infusion treatment areas, laboratory space, staff lounge and work areas, and an internal mechanical room with a standalone air handling unit.

• NM Lavin Pavilion 21st Floor Internal Medicine Clinic (Streeterville, Chicago) – 15,000-SF build-out in core and shell building on Northwestern Medicine’s Streeterville Campus featuring 25 exam rooms, staff offices and lounge area, laboratory space, and various support spaces. The project was completed on an expedited timeframe and utilized extensive building information modeling (BIM).

• NM Galter 1 Renovations (Streeterville, Chicago) – Upgrades to the existing Galter Pavilion 1st Floor Lobby including seating areas featuring new terrazzo, lighting and upgraded finishes. The project was completed in multiple phases with no impact to hospital operations.

• Prentice Operating Room Video Integration (Streeterville, Chicago) – Interior upgrades to 10 Operating Rooms and supporting services within Prentice Women’s Hospital. The upgrade consisted of finishes, millwork, terrazzo flooring, OR booms and lights with structure, and video integration systems with associated electrical work. Extensive coordination with the Owner’s equipment vendors involved to provide the complete electrical infrastructure for the new systems. This project involved refreshing of an old OR suite for temp use and moving the entire OR operations to the temp space prior to the start of construction.

Skender’s team has successfully completed renovation and new construction work for other healthcare clients with a strong Midwest presence, including Ann & Robert H. Lurie Children's Hospital of Chicago, Esperanza Health Centers, University of Chicago Medicine, Rush University Medical Center and Loyola Medicine.

For more information on Skender, visit www.skender.com.



September 19, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.